Time for the receipt of tenders or requests to participate have to be received by 28 May 2013 at 15.30pm (EST).
The first crane has to be operational in the summer of 2016. A purchase consideration will be given for a second crane between 1 January 2018 and 31 December 2018.
Some of the crane requirements:
– Life expectancy of the crane has to be 40 years.
– Resistance to earthquake
– Resistance to a pressure wave
– Completion of the project within the nuclear safety requirements.
– Main hoist: 120t at 40m
– Auxiliary Lifting: 10 tonnes at about 60m
– Lifting height: 65m for a range of about 55 m.
– Minimum height of the cab: 30m
– The crane will have to move on an existing crane width of 18m and a length of about 200m crane track.
– It must be supplied with 10kv.
For further information:
BCRM Toulon – ESID Toulon
boîte postale n° 71
83800 Toulon Cedex 9
FRANCE
For the attention of: L’IGTM, directeur de l’établissement du SID de Toulon
Telephone: +33 422424510
E-mail: esidtln.sai@gmail.com