The work to be carried out include underwater repair works to damaged sheet piles and are to be carried out according to a design and construction method to be devised by the port.
Additional minor repair and refurbishment works, specified in outline by the port, are to be carried out above the waterline on the quay wall capping beam.
A pre-tender meeting will be held on 22 December 2015 at 11am.